Name | Date modified | File size |
|
|---|---|---|---|
BREAK IN CONCRETE | Mar 24, 2024 | — | |
BOREDPILE, PILECAP, KOLOM & PORTAL | Dec 13, 2023 | — | |
BOX CAST INSITU TYPIKAL | Dec 13, 2023 | — | |
BOX GIRDER PRECAST TYPIKAL | Dec 13, 2023 | — | |
BOX GIRDER W10 CAST INSITU BEKASI LINE | Dec 13, 2023 | — | |
CROSS SECTION STRUKTUR | Dec 13, 2023 | — | |
DEMOLITION BUILDING | Mar 24, 2024 | — | |
DRAINASE | Dec 22, 2023 | — | |
FIBER OPTIC PERMANEN STASIUN MANGGARAI | Dec 20, 2023 | — | |
GEDUNG ARSIP | Dec 20, 2023 | — | |
LIFT DAN ESKALATOR WINGS KIRI | Dec 20, 2023 | — | |
MODIFIKASI & ADJUSTING FO | Mar 24, 2024 | — | |
OVERCAPING TEMPORARY | Mar 23, 2024 | — | |
PAGAR ORNAMEN JALUR V CIPINANG JATINEGARA | Jan 14, 2024 | — | |
PASSANGGER CROSSING TEMPORARY P09-10 MANGGARAI (ASPHALT) | Mar 24, 2024 | — | |
PASSANGGER CROSSING TEMPORARY SISI SELATAN P08-09 MANGGARAI | Mar 24, 2024 | — | |
PCI GIRDER | Dec 13, 2023 | — | |
PEKERJAAN JANITOR TANGGA SELATAN PERON 2 | Mar 24, 2024 | — | |
PENGALIHAN PASSENGER CROSSING BARU STASIUN MANGGARAI UNTUK MELANJUTKAN PEKERJAAN PERON I & TRACK JALUR I | Mar 25, 2024 | — | |
PERON | Dec 13, 2023 | — | |
RETAINING WALL | Dec 13, 2023 | — | |
RIGID CIPINANG | Dec 20, 2023 | — | |
STEEL SHEET PILE | Mar 22, 2024 | — | |
TANGGA BAJA MANUAL STATION | Dec 13, 2023 | — | |
TRACK | Dec 20, 2023 | — | |
00 ABD - CIVIL WORK.pdf Shared | Jan 3 | 913.2 MB | |
List Asbuilt Drawing.xlsx Shared | Jan 25, 2024 | 65 KB | |
Plan Box Girder 110% Rev1.dwg Shared | Mar 21, 2024 | 5.2 MB |
